66a44354cd
Adds the CI workflow, ESLint flat config, basic prestige action, and tunes three off-balance numbers in the day-1 content. CI runs three parallel jobs: `static` (lint, typecheck, prettier, build), `test` (unit + Postgres-backed integration via service container, with coverage gate), and `security` (gitleaks + trivy). Scratch crypto keys are generated per-run from openssl so the server can boot in CI without any committed secrets. Prestige UI: a "git commit" / "git tag -a" button in each prestigeable layer's canvas header, gated on the upstream `best` threshold. Displays projected gain inline (`// +N ⭐`) so the trade is visible before clicking. Balance fixes: - Releases requirement was 1000 commits (≈5B LoC, unreachable) with a gain formula that returned 0 at the threshold. Aligned both at 100 commits with prestigePoints exponent 0.5. - Tech Debt accrual was 0.0005 × code/s (500 debt/s at 1M LoC). Reduced to 0.0001 — still meaningful, no longer punitive. - Pay-Down Debt was effect=-10 per buyable, instantly turning the production multiplier to -9. Changed to -0.1 (each pay-down slows accrual by 10%; 10 pay-downs stops it; further buys reverse the flow). Also corrected costLayer to "code" so it spends LoC, not Debt. Schema: added `costLayer` to Buyable to match Upgrade (needed for the Tech Debt fix). RightPanel now honors `costLayer` for both upgrades and buyables — the cost-side affordability check and the spendAmount target both follow the override. Verification: - pnpm -r typecheck: clean - pnpm -r lint: clean - pnpm format:check: clean - pnpm -r test: 73 unit tests pass - pnpm --filter @teh-riehl/server test:integration: 7/7 pass - 80 tests total Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
3 lines
27 B
YAML
3 lines
27 B
YAML
packages:
|
|
- 'packages/*'
|